Explaining success and failures in PPP transport projects: an econometric approach

Authors

  • Lourdes Trujillo University of Las Palmas de Gran Canaria
  • Federico Inchausti-Sintes University of Las Palmas de Gran Canaria
  • Javier Campos University of Las Palmas de Gran Canaria
  • Casiano Manrique-de-Lara-Peñate University of Las Palmas de Gran Canari

DOI:

https://doi.org/10.18757/ejtir.2018.18.4.3266

Abstract

There are a multitude of factors, both internal and external, that may affect the development and success of any transport project. ‘Success’ is both context-dependent and quite difficult to measure. This paper distinguishes between four types of ‘success’ variables: (lack of) cost overruns; (lack of) time delays; (ex-post) level of traffic; and (generated) revenues. Each variable is modeled in a binary way (using discrete choice models), with each model estimating the relevance of various explanatory factors on the probability of success. Internal factors are found to have the greatest effect on that probability, and PPP projects seem to be prone to budget overruns and delays. Governance factors, such as the tender process, renegotiations, and issues related to penalties, among others, can all produce complications. Since the public authority has control over most of these variables, these results could be used to improve the ‘success’ of these projects.

Downloads

Metrics

PDF views
200
Jan 2019Jul 2019Jan 2020Jul 2020Jan 2021Jul 2021Jan 2022Jul 2022Jan 2023Jul 2023Jan 2024Jul 2024Jan 2025Jul 2025Jan 202613
|

Downloads

Published

2018-09-01

How to Cite

Trujillo, L., Inchausti-Sintes, F., Campos, J., & Manrique-de-Lara-Peñate, C. (2018). Explaining success and failures in PPP transport projects: an econometric approach. European Journal of Transport and Infrastructure Research, 18(4). https://doi.org/10.18757/ejtir.2018.18.4.3266

Issue

Section

Research articles