Pareto-improving toll adjustment for a buildoperate-transfer toll road project with unknown demand

Authors

  • Zhijia Tan Huazhong University of Science and Technology
  • Wei Tan Huazhong University of Science and Technology

DOI:

https://doi.org/10.18757/ejtir.2014.14.1.3016

Abstract

The social welfare gain and investment return are two main concerns of a road investment project, and they are usually key components of a Build-operate-transfer (BOT) contract. Therefore, the Pareto efficient outcomes of the two objectives are attractive for both government and private investor. This paper proposes a ex-post toll adjustment procedure called Paretoimproving trial-and-error procedure (PI-TEP), in order to achieve the Pareto efficient outcomes for a BOT toll road project with pre-determined road capacity and unknown demand function. The PI-TEP is novel and Pareto-improving, since the procedure does not require an analytical demand function and can improve social welfare and revenue simultaneously. Furthermore, the PI-TEP is theoretically proved to be efficient in obtaining the Pareto efficient outcomes. And thus, the procedure is practically useful and valuable for both government and private investor in a BOT toll road project.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Downloads

Published

2014-01-01

How to Cite

Tan, Z., & Tan, W. (2014). Pareto-improving toll adjustment for a buildoperate-transfer toll road project with unknown demand. European Journal of Transport and Infrastructure Research, 14(1). https://doi.org/10.18757/ejtir.2014.14.1.3016

Issue

Section

Articles